Hi,
I have an item that ran a script in the endpoint machine which gives me a numeric value for memory trend use,
I want to have another item that will be triggered beforehand that will do a preparation for the 2nd script
and one more item that will run after to do some finalization.
Is it possible to have such dependency orchestration?
thanks,
Hadar
I have an item that ran a script in the endpoint machine which gives me a numeric value for memory trend use,
I want to have another item that will be triggered beforehand that will do a preparation for the 2nd script
and one more item that will run after to do some finalization.
Is it possible to have such dependency orchestration?
thanks,
Hadar

Comment