We are considering a move to another monitoring tool and are looking at Zabbix. We need the ability to downgrade events until they reach a certain number of repetitions. For example, a CPU Usage checks normally reports "high" is over 90%. However, this is downgraded to warning until the threshold is exceeded for four check intervals.
We would also like to be able to downgrade severities based on tags. For example, test systems are downgraded from High to Warning. From what I see this would be done not by downgrading but in the templates, where the templates are assigned by such tags. Is this correct?
Thanks in advance.
We would also like to be able to downgrade severities based on tags. For example, test systems are downgraded from High to Warning. From what I see this would be done not by downgrading but in the templates, where the templates are assigned by such tags. Is this correct?
Thanks in advance.
Comment