Ad Widget

Collapse

Sugg. No. 5: Graph creation with in consideration of min and max peaks

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • just2blue4u
    Senior Member
    • Apr 2006
    • 347

    #1

    Sugg. No. 5: Graph creation with in consideration of min and max peaks

    A graph often hast min and max peaks. If i watch one with time range 1h, it hast a maximum (shown) of 90 (example). if i watch the same item with time range 1week, the drawn max is only 80 while the legend says max: 90.

    suggestion:
    When fetching data to print into the graph, watch for min / max peaks and make zabbix regard them when printing the graph. So the week/month/etc graphs become more meaningful.
    Big ZABBIX is watching you!
    (... and my 48 hosts, 4513 items, 1280 triggers via zabbix v1.6 on CentOS 5.0)
Working...