We will gradually roll out this change in waves:
Wave 1 – effective August 15th, 2024: All new Connector creation will be blocked within all clouds
Wave 2 – effective October 1st, 2024: All connectors within all clouds will stop working
Some attitude of Zabbix on the termination of the functionality?
Wave 1 – effective August 15th, 2024: All new Connector creation will be blocked within all clouds
Wave 2 – effective October 1st, 2024: All connectors within all clouds will stop working
Some attitude of Zabbix on the termination of the functionality?

Comment