Hi Folks
I have a calculation that needs to run at 5am each day, this works perfectly, however when I look at the "latest data" there is a 2nd run of the calculation just before 20h00 each day as well, which I don't need or want.


Am I doing something wrong ? Could there be a global schedule that is adding this 2nd entry ?
I have a calculation that needs to run at 5am each day, this works perfectly, however when I look at the "latest data" there is a 2nd run of the calculation just before 20h00 each day as well, which I don't need or want.
Am I doing something wrong ? Could there be a global schedule that is adding this 2nd entry ?
Comment