If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to REGISTER before you can post. To start viewing messages, select the forum that you want to visit from the selection below.
Is there any way to schedule an outage or some way to tell zabbix that during a specific time window specific servers or services will be unavailable (upgrades, etc)?
This looks like an old thread, but I have the same need. Anyway to do this maybe at the trigger level? Set a time period that can be blacked out so that the trigger doesnt hit? I have daily jobs on some servers that require the service to be shut down for a short time to complete. Of course Zabbix picks this up as a problem in triggers and I get alerts I don't need/want.
Nevermind - I think I found what I need. I think that setting the "time period" condition" using the "not in" evaluation for the blackout time on an action will work for me. At least I hope it does
Comment